Industrial Engineering and Management Systems
DOI: 10.7232/iems
ISSN: 1598-7248
Industrial Engineering and Management Systems (IEMS) has been launched by the APIEMS (Asian Pacific Industrial Engineering and Management Society) and now it is an official journal of APIEMS and KIIE (Korean Institute of Industrial Engineers). IEMS is intended for reporting original quality works on industrial engineering and management systems. The journal publishes original works that have significant theoretical and academic values, novel industrial applications, and case studies. Every manuscript is strictly reviewed by two or more anonymous referees and final acceptance decision is made based on the review reports. The journal aims at speedy review and processing and it will publish four issues per year. IEMS covers all areas of industrial engineering and management sciences including, but not limited to, applied statistics & data mining, business & information systems, computational intelligence & optimization, emerging technologies, ergonomics & human factors, logistics, manufacturing systems, planning & scheduling, quality & reliability, stochastics & simulation, supply chain management.

Article List (15)
An Enhanced Two-Phase Fuzzy Programming Model for Multi-Objective Supplier Selection Problem
Author: Fatrias Dicky, Shimizu Yoshiaki
DOI: 10.7232/iems.2012.11.1.001
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p1~10, 01 March 2012
DOI: 10.7232/iems.2012.11.1.001
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p1~10, 01 March 2012
Safer Zone Analysis for Multiple Investment Alternatives on the Total-Cost Unit-Cost Domain
Author: Kono Hirokazu
DOI: 10.7232/iems.2012.11.1.011
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p11~17, 01 March 2012
DOI: 10.7232/iems.2012.11.1.011
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p11~17, 01 March 2012
Uncertain Programming Model for Chinese Postman Problem with Uncertain Weights
Author: Zhang Bo, Peng Jin
DOI: 10.7232/iems.2012.11.1.018
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p18~25, 01 March 2012
DOI: 10.7232/iems.2012.11.1.018
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p18~25, 01 March 2012
Support Vector Machine Based on Type-2 Fuzzy Training Samples
Author: Ha Ming-hu, Huang Jia-ying, Yang Yang, Wang Chao
DOI: 10.7232/iems.2012.11.1.026
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p26~29, 01 March 2012
DOI: 10.7232/iems.2012.11.1.026
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p26~29, 01 March 2012
A Mathematical Analysis on Daily Inventory Clearance Pricing with Consumer’s Reference Price
Author: Koide Takeshi, Sandoh Hiroaki
DOI: 10.7232/iems.2012.11.1.030
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p30~38, 01 March 2012
DOI: 10.7232/iems.2012.11.1.030
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p30~38, 01 March 2012
Communication-Centered Project Management for Requirements Definition Phase
Author: Ishii Nobuaki, Muraki Masaaki
DOI: 10.7232/iems.2012.11.1.039
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p39~47, 01 March 2012
DOI: 10.7232/iems.2012.11.1.039
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p39~47, 01 March 2012
Optimal Switching Frequency in Limited-Cycle with Multiple Periods
Author: Sun Jing, Yamamoto Hisashi, Matsui Masayuki, Kong Xianda
DOI: 10.7232/iems.2012.11.1.048
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p48~53, 01 March 2012
DOI: 10.7232/iems.2012.11.1.048
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p48~53, 01 March 2012
An Integrated Approach to Measuring Supply Chain Performance
Author: Theeranuphattana Adisak, Tang John C.S., Khang Do Ba
DOI: 10.7232/iems.2012.11.1.054
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p54~69, 01 March 2012
DOI: 10.7232/iems.2012.11.1.054
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p54~69, 01 March 2012
Design Requirements in Software and Engineering Systems
Author: Eleiche A. M., Ahmad I., Elish M. O.
DOI: 10.7232/iems.2012.11.1.070
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p70~81, 01 March 2012
DOI: 10.7232/iems.2012.11.1.070
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p70~81, 01 March 2012
Pre-Processing of Query Logs in Web Usage Mining
Author: Abdullah Norhaiza Ya, Husin Husna Sarirah, Ramadhani Herny, Nadarajan Shanmuga Vivekanada
DOI: 10.7232/iems.2012.11.1.082
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p82~86, 01 March 2012
DOI: 10.7232/iems.2012.11.1.082
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p82~86, 01 March 2012
An Optimal Weighting Method in Supervised Learning of Linguistic Model for Text Classification
Author: Mikawa Kenta, Ishida Takashi, Goto Masayuki
DOI: 10.7232/iems.2012.11.1.087
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p87~93, 01 March 2012
DOI: 10.7232/iems.2012.11.1.087
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p87~93, 01 March 2012
An Interactive Planning and Scheduling Framework for Optimising Pits-to-Crushers Operations
Author: Liu Shi Qiang, Kozan Erhan
DOI: 10.7232/iems.2012.11.1.094
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p94~102, 01 March 2012
DOI: 10.7232/iems.2012.11.1.094
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p94~102, 01 March 2012
A Simulation Study on a Workload-based Operation Planning Method in Container Terminals
Author: Jeong Yeon-Ho, Kim Kap Hwan, Woo Youn Ju, Seo Bo Hyeon
DOI: 10.7232/iems.2012.11.1.103
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p103~113, 01 March 2012
DOI: 10.7232/iems.2012.11.1.103
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p103~113, 01 March 2012
Non-Identical Parallel Machine Scheduling with Sequence and Machine Dependent Setup Times Using Meta-Heuristic Algorithms
Author: Joo Cheol Min, Kim Byung Soo
DOI: 10.7232/iems.2012.11.1.114
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p114~122, 01 March 2012
DOI: 10.7232/iems.2012.11.1.114
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p114~122, 01 March 2012
Automation of Decision-Making in the Game “Ecopoly” for Education on Relationship between Environment and Economy
Author: Komuro Tatsuya, Shinozaki Ayano, Kim Aramu, Doyo Daisuke, Matsumoto Toshiyuki
DOI: 10.7232/iems.2012.11.1.123
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p123~132, 01 March 2012
DOI: 10.7232/iems.2012.11.1.123
Publish: Industrial Engineering and Management Systems Volume 11, Issue 1, p123~132, 01 March 2012